Clipsal C-Bus2 Manual de Instalação Página 2

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 1
Intelligent Building Series C-Bus Infrared Transmitter Installation Instructions
Table of Contents
Section..................................................................................................... Page
1.0 Product Range ........................................................................................3
2.0 Description ..............................................................................................3
3.0 Installation Instructions............................................................................4
3.1 Mounting Considerations...................................................................4
3.2 Infrared Emitter Leads .......................................................................4
3.3 Connection to the C-Bus Network .....................................................5
3.4 High Speed Serial Connection...........................................................6
4.0 Status Indicators......................................................................................7
4.1 Unit IR1 Indicator:..............................................................................7
4.2 C-Bus IR2 Indicator: ..........................................................................7
5.0 C-Bus System Clock ...............................................................................8
6.0 C-Bus Network Burden............................................................................8
7.0 C-Bus Power Requirements....................................................................8
8.0 Power Up Load Status ............................................................................8
9.0 Power Surges and Short Circuit Conditions ............................................9
10.0 Megger Testing .......................................................................................9
11.0 Standards Complied................................................................................9
12.0 Programming Requirements..................................................................10
12.1 Programming C-Bus Operating Parameters....................................10
12.2 Programming Infrared Operating Parameters .................................10
12.3 Important Warning ...........................................................................10
13.0 Electrical Specifications.........................................................................11
14.0 Mechanical Specifications .....................................................................11
Copyright Notice
Copyright 2002 Clipsal Integrated Systems Pty Ltd. All rights reserved.
Trademarks
Clipsal is a registered trademark of Gerard Industries Pty Ltd.
C-Bus is a registered trademark of Clipsal Integrated Systems Pty Ltd
Intelligent Building Series is a registered trademark of Clipsal Integrated Systems Pty Ltd
CIRCA is a trademark of Clipsal Integrated Systems Pty Ltd
All other logos and trademarks are the property of their respective owners.
Disclaimer
Clipsal Integrated Systems reserves the right to change specifications or designs described in this manual without
notice and without obligation.
© Copyright 2002 Clipsal Integrated Systems Pty Ltd Page 2
Vista de página 1
1 2 3 4 5 6 7 ... 11 12

Comentários a estes Manuais

Sem comentários